Daily Git Summary

Standup summary for Monday, May 18, 2026 (after merge)

This regenerated report uses merged history for the full May 18 local-day window (2026-05-18 00:00 -0400 through 2026-05-19 00:00 -0400). It now includes eight commits, including native deployment work and the merge commit that landed that line of work on main.

Commits
8
Unique Files
68
Insertions
4244
Deletions
194

Summary

User-facing delivery

Commit 906fe411 added Alpaca news wire support across ingest, storage, API, and web terminal/news route surfaces.

Platform and deployment delivery

Commits d589858c and bdb9d9a9 added native deployment workflow, infra/user units, cutover, rollback, and health-check scripts, then merged via 8f0794dd (PR #2).

Workflow and docs updates

Commits 687a2170, 62aae708, 48095fce, and 04baeceb updated beads/docs instructions and added turn/standup documentation.

Changes Made

update beads 687a2170 2026-05-18 03:15 -0400 1 file

Touched deployment/docker/workspace-root/package.json with one-line change.

Implement native fast iterative deploy workflow d589858c 2026-05-18 03:34 -0400 17 files +873 / -110
  • Expanded scripts/deploy.ts for native deploy runtime behavior.
  • Added native user-unit templates and rollback/health tooling in deployment/native/.
  • Added associated plan and turn documents in docs/plans and docs/turns.
fix(api): remove duplicate alert context import 48095fce 2026-05-18 09:04 -0400 2 files

Removed duplicate import in services/api/src/index.ts and added a turn doc.

docs(general): add 2026-05-17 standup summary 62aae708 2026-05-18 09:05 -0400 2 files

Added docs/general/2026-05-18-standup-summary-2026-05-17.html and updated beads state.

add alpaca news wire across ingest api and web 906fe411 2026-05-18 16:55 -0400 31 files +1407 / -50
  • Created services/ingest-news and wired Alpaca backfill/websocket ingestion.
  • Added news types/storage contracts in packages/types and packages/storage.
  • Extended API live/history endpoints and web terminal/news route rendering.
Implement native public edge cutover bdb9d9a9 2026-05-18 19:55 -0400 29 files +1215 / -31
  • Added native infra system units and scripts for bootstrap/start/stop/cutover/full rollback.
  • Updated deploy docs and runtime config files under deployment/native/config.
  • Added turn doc docs/turns/2026-05-18-native-public-edge-cutover.html.
Merge pull request 'Native public edge cutover with Docker rollback path' (#2) 8f0794dd 2026-05-19 00:09 +0000 merge commit

Merged native-deploy into main within the May 18 US/Eastern day window.

update turn docs and beads workflow 04baeceb 2026-05-18 21:32 -0400 1 file

Updated repository-level instructions in AGENTS.md.

Context

The earlier report was generated before merged history included the native deployment branch on main. This recreation uses git log --all over the same date window, so it captures both feature work and merged operational/deployment work visible after PR merge.

Important Implementation Details

News wire ingestion and delivery path

The news pipeline added a new ingest service and API fanout channel, then exposed UI surfaces in /news and terminal panes.

if (features.news) {
  subscriptions.push({ channel: "news", snapshot_limit: LIVE_OPTIONS_HEAD_LIMIT });
}

Native deployment hardening

Deployment scripts and unit templates now include direct scripts for cutover and rollback, with infra and service checks under deployment/native/.

deployment/native/cutover.sh
deployment/native/full-rollback.sh
deployment/native/install-infra-units.sh

Merged history effect on standup scope

The merged view increased the standup scope from 4 to 8 commits and from 35 to 68 unique files touched for the same local-day window.

Expected Impact for End-Users

Trading UI users

Live news wire data is now available in terminal surfaces alongside existing market/event feeds.

Operators

Native deployment and rollback procedures now have first-class scripted and documented paths.

Team reporting

This standup report now matches merged repository history instead of pre-merge branch-local history.

Validation

Issues, Limitations, and Mitigations

Follow-up Work