Touched deployment/docker/workspace-root/package.json with one-line change.
Standup summary for Monday, May 18, 2026 (after merge)
This regenerated report uses merged history for the full May 18 local-day window
(2026-05-18 00:00 -0400 through 2026-05-19 00:00 -0400). It now includes eight commits,
including native deployment work and the merge commit that landed that line of work on main.
Summary
Commit 906fe411 added Alpaca news wire support across ingest, storage, API, and web terminal/news
route surfaces.
Commits d589858c and bdb9d9a9 added native deployment workflow, infra/user units,
cutover, rollback, and health-check scripts, then merged via 8f0794dd (PR #2).
Commits 687a2170, 62aae708, 48095fce, and 04baeceb updated
beads/docs instructions and added turn/standup documentation.
Changes Made
- Expanded
scripts/deploy.tsfor native deploy runtime behavior. - Added native user-unit templates and rollback/health tooling in
deployment/native/. - Added associated plan and turn documents in
docs/plansanddocs/turns.
Removed duplicate import in services/api/src/index.ts and added a turn doc.
Added docs/general/2026-05-18-standup-summary-2026-05-17.html and updated beads state.
- Created
services/ingest-newsand wired Alpaca backfill/websocket ingestion. - Added news types/storage contracts in
packages/typesandpackages/storage. - Extended API live/history endpoints and web terminal/news route rendering.
- Added native infra system units and scripts for bootstrap/start/stop/cutover/full rollback.
- Updated deploy docs and runtime config files under
deployment/native/config. - Added turn doc
docs/turns/2026-05-18-native-public-edge-cutover.html.
Merged native-deploy into main within the May 18 US/Eastern day window.
Updated repository-level instructions in AGENTS.md.
Context
The earlier report was generated before merged history included the native deployment branch on main.
This recreation uses git log --all over the same date window, so it captures both feature work and
merged operational/deployment work visible after PR merge.
Important Implementation Details
News wire ingestion and delivery path
The news pipeline added a new ingest service and API fanout channel, then exposed UI surfaces in
/news and terminal panes.
if (features.news) {
subscriptions.push({ channel: "news", snapshot_limit: LIVE_OPTIONS_HEAD_LIMIT });
}
Native deployment hardening
Deployment scripts and unit templates now include direct scripts for cutover and rollback, with infra and
service checks under deployment/native/.
deployment/native/cutover.sh
deployment/native/full-rollback.sh
deployment/native/install-infra-units.sh
Merged history effect on standup scope
The merged view increased the standup scope from 4 to 8 commits and from 35 to 68 unique files touched for the same local-day window.
Expected Impact for End-Users
Live news wire data is now available in terminal surfaces alongside existing market/event feeds.
Native deployment and rollback procedures now have first-class scripted and documented paths.
This standup report now matches merged repository history instead of pre-merge branch-local history.
Validation
- Used
git fetch --all --prunebefore recomputing history. - Used
git log --allover the May 18 ET window to include merged commits. - Used
git log --stat --summaryand--numstatto ground file and line-count statements. - No build/test commands were run because this task only regenerates reporting documentation.
Issues, Limitations, and Mitigations
- This report describes commit history only and does not infer intent beyond commit messages and touched files.
- Commit
8f0794ddis timestamped in UTC; it still falls on May 18 in US/Eastern, so it is included. - Metrics are based on local git history at regeneration time and can change if additional backdated commits appear.
Follow-up Work
- This regeneration is tracked by beads issue
islandflow-0ty. - No additional follow-up work was identified during this documentation-only task.