diff --git a/.beads/issues.jsonl b/.beads/issues.jsonl
index ac5a7f3..63aebba 100644
--- a/.beads/issues.jsonl
+++ b/.beads/issues.jsonl
@@ -115,6 +115,7 @@
{"_type":"issue","id":"islandflow-zs0","title":"Migrate terminal UI to smart-money profiles","description":"Migrate apps/web terminal rendering to consume SmartMoneyEvent directly: primary profile, probability ladder, reason codes, and suppression/abstention state, while preserving legacy alert/classifier displays during the bridge.","status":"closed","priority":2,"issue_type":"task","owner":"dishes@dpdrm.com","created_at":"2026-05-04T21:35:23Z","created_by":"dirtydishes","updated_at":"2026-05-05T05:39:58Z","closed_at":"2026-05-05T05:39:58Z","close_reason":"Completed terminal smart-money profile migration","dependency_count":0,"dependent_count":0,"comment_count":0}
{"_type":"issue","id":"islandflow-igk","title":"Add plan mode","description":"Implement a user-facing plan mode in the application so users can switch into planning before taking action. Scope to be clarified from existing app patterns.","status":"closed","priority":2,"issue_type":"feature","owner":"dishes@dpdrm.com","created_at":"2026-05-04T04:22:37Z","created_by":"dirtydishes","updated_at":"2026-05-04T04:26:18Z","started_at":"2026-05-04T04:22:40Z","closed_at":"2026-05-04T04:26:18Z","close_reason":"Implemented as a global pi extension toggled with Shift+P","dependency_count":0,"dependent_count":0,"comment_count":0}
{"_type":"issue","id":"islandflow-biq","title":"Finish raw live options delivery and filter/backpressure observability","description":"The smart-money signal path and Tape filters are in place, but the next firehose pass should finish server-side selective raw live delivery for options subscriptions and add explicit filtered-out/backpressure observability for API/web counters. This was discovered while landing islandflow-e4r.\n","status":"in_progress","priority":2,"issue_type":"task","assignee":"dirtydishes","owner":"dishes@dpdrm.com","created_at":"2026-04-28T20:28:58Z","created_by":"dirtydishes","updated_at":"2026-04-29T03:54:12Z","started_at":"2026-04-29T03:54:12Z","dependencies":[{"issue_id":"islandflow-biq","depends_on_id":"islandflow-e4r","type":"discovered-from","created_at":"2026-04-28T16:28:58Z","created_by":"auto-import","metadata":"{}"}],"dependency_count":0,"dependent_count":0,"comment_count":0}
+{"_type":"issue","id":"islandflow-q0t","title":"Publish June 11 standup git summary","description":"## Summary\nCreate the daily git-grounded standup summary for 2026-06-11 activity in docs/general.\n\n## Why this matters\nThe team needs a scannable record of yesterday's repo activity anchored to commits, Beads items, and touched files.\n\n## Scope\nInspect June 11 commits, summarize the work in HTML under docs/general, and close the task once the document is written.","status":"closed","priority":3,"issue_type":"task","assignee":"dirtydishes","owner":"dishes@dpdrm.com","created_at":"2026-06-12T13:03:42Z","created_by":"dirtydishes","updated_at":"2026-06-12T13:05:40Z","started_at":"2026-06-12T13:03:45Z","closed_at":"2026-06-12T13:05:40Z","close_reason":"Created docs/general/2026-06-12-0903-standup-summary-2026-06-11.html with a commit-grounded summary of June 11 activity.","dependency_count":0,"dependent_count":0,"comment_count":0}
{"_type":"issue","id":"islandflow-ksr","title":"Publish June 10 standup git summary","description":"Why this issue exists and what needs to be done:\\n\\nCreate the daily standup summary for June 10, 2026 git activity in docs/general, grounded in commits and touched files, then commit and push the documentation update.","status":"closed","priority":3,"issue_type":"task","assignee":"dirtydishes","owner":"dishes@dpdrm.com","created_at":"2026-06-11T13:02:18Z","created_by":"dirtydishes","updated_at":"2026-06-11T13:04:10Z","started_at":"2026-06-11T13:02:35Z","closed_at":"2026-06-11T13:04:10Z","close_reason":"Created docs/general/2026-06-11-0902-standup-summary-2026-06-10.html with a git-grounded summary of June 10 activity.","dependency_count":0,"dependent_count":0,"comment_count":0}
{"_type":"issue","id":"islandflow-f09","title":"Publish standup summary for 2026-06-08","description":"Why this issue exists and what needs to be done\\n\\nCreate the daily git-grounded standup summary for repository activity on 2026-06-08, save the HTML artifact in docs/general, and include only statements anchored to commits and touched files.","status":"closed","priority":3,"issue_type":"task","assignee":"dirtydishes","owner":"dishes@dpdrm.com","created_at":"2026-06-09T13:02:31Z","created_by":"dirtydishes","updated_at":"2026-06-09T13:04:19Z","started_at":"2026-06-09T13:02:53Z","closed_at":"2026-06-09T13:04:19Z","close_reason":"Created docs/general/2026-06-09-0902-standup-summary-2026-06-08.html with a git-grounded summary of June 8 activity.","dependency_count":0,"dependent_count":0,"comment_count":0}
{"_type":"issue","id":"islandflow-5rt","title":"Summarize June 2 git activity for standup","description":"Create the daily standup summary in docs/general for 2026-06-02 activity, anchored to yesterday's commits and touched files.","status":"closed","priority":3,"issue_type":"task","assignee":"dirtydishes","owner":"dishes@dpdrm.com","created_at":"2026-06-03T16:30:03Z","created_by":"dirtydishes","updated_at":"2026-06-03T16:31:33Z","started_at":"2026-06-03T16:31:26Z","closed_at":"2026-06-03T16:31:33Z","close_reason":"Closed","dependency_count":0,"dependent_count":0,"comment_count":0}
diff --git a/docs/general/2026-06-12-0903-standup-summary-2026-06-11.html b/docs/general/2026-06-12-0903-standup-summary-2026-06-11.html
new file mode 100644
index 0000000..028b230
--- /dev/null
+++ b/docs/general/2026-06-12-0903-standup-summary-2026-06-11.html
@@ -0,0 +1,609 @@
+
+
+
+
+
+ Standup Summary for 2026-06-11
+
+
+
+
+
+ Git Standup Summary
+ June 11 centered on mock-route expansion and refinement
+
+ June 11 included seven commits. Six of them were frontend-facing mock
+ route and styling updates in apps/web/app, moving from
+ initial redesign concepts through twelve mock routes and then replacing
+ the Activity Matrix with an alert-lineage treatment. One commit
+ published the prior day’s standup summary in docs/general.
+
+
+
+
+
+ Summary
+
+
+
Mock coverage widened.
+
+ Commits 58ff9bb and 8b8f124 added
+ route files for /mock5 through /mock12,
+ while earlier commits reworked the shared mock renderer in
+ apps/web/app/dashboard-mocks.tsx.
+
+
+
+
Shared terminal styling stayed in motion.
+
+ Commits 83b0944, e7924c8,
+ 58ff9bb, 8b8f124, and
+ dad805b all touched
+ apps/web/app/globals.css.
+
+
+
+
Late-day refinements tightened clarity.
+
+ Commit 4204320 tightened terminal copy, and commit
+ dad805b replaced the abstract Activity Matrix with an
+ alert-lineage mock recorded under Beads issue
+ islandflow-4j7.
+
+
+
+
+
+
+ Changes Made
+
+
+
04:18 - Ground-up redesign mocks
+
83b0944 - create ground-up frontend redesign mocks
+
+ Reworked apps/web/app/dashboard-mocks.tsx and
+ apps/web/app/globals.css, and added the supporting
+ documentation file
+ docs/turns/2026-06-11-0416-ground-up-redesign-mocks.html.
+
+
+ dashboard-mocks.tsx
+ globals.css
+ docs/turns/...ground-up-redesign-mocks.html
+
+
+
+
+
05:10 - Route concept redesign
+
e7924c8 - redesign mock route concepts
+
+ Continued the mock-route redesign in the same shared renderer and
+ stylesheet, and also touched
+ apps/web/app/terminal.tsx.
+
+
+ Beads: islandflow-2x7
+
+
+
+
+
09:04 - Prior standup published
+
5e55b70 - Add June 10 standup git summary
+
+ Added
+ docs/general/2026-06-11-0902-standup-summary-2026-06-10.html
+ and closed islandflow-ksr.
+
+
+
+
+
18:29 - /mock5 through /mock8 added
+
58ff9bb - add no-card mock redesign routes
+
+ Added route files for /mock5, /mock6,
+ /mock7, and /mock8, plus large updates
+ to the shared mock renderer, global styles, and a matching turn
+ document.
+
+
+ Beads: islandflow-q7v
+
+
+
+
+
19:37 - Copy tightened
+
4204320 - tighten mock route terminal copy
+
+ Refined copy inside apps/web/app/dashboard-mocks.tsx
+ and updated the existing turn document for the no-card mock work.
+
+
+ Beads: islandflow-w2y
+
+
+
+
+
19:48 - /mock9 through /mock12 added
+
8b8f124 - add dense dashboard mock routes
+
+ Added route files for /mock9, /mock10,
+ /mock11, and /mock12, expanded
+ dashboard-mocks.tsx and globals.css,
+ and added
+ docs/turns/2026-06-11-1946-add-four-dashboard-mocks.html.
+
+
+ Beads: islandflow-5bv
+
+
+
+
+
20:15 - Activity Matrix replaced
+
dad805b - make activity matrix legible
+
+ Updated dashboard-mocks.tsx and
+ globals.css. The paired Beads close reason says issue
+ islandflow-4j7 replaced the Activity Matrix with an
+ alert-lineage mock showing evidence, invalidations, and audit
+ context.
+
+
+
+
+
+
+ Context
+
+ The day’s work stayed concentrated in the mock-dashboard surface of
+ the web app. The most repeatedly edited files were
+ apps/web/app/dashboard-mocks.tsx and
+ apps/web/app/globals.css, which appeared in six of the
+ seven commits. The only new runtime entrypoints added on June 11 were
+ the eight route files for /mock5 through
+ /mock12.
+
+
+
+
Route Expansion
+
+ Route files added:
+ mock5/page.tsx through
+ mock12/page.tsx.
+
+
+
+
Documentation Added
+
+ New HTML docs landed in both docs/turns and
+ docs/general.
+
+
+
+
Issue Tracking
+
+ Each mock-route milestone was paired with a closed Beads task:
+ 3vr, 2x7, q7v,
+ w2y, 5bv, and 4j7.
+
+
+
+
+
+
+ Important Implementation Details
+
+ -
+ The route additions were incremental rather than a single sweep:
+
58ff9bb introduced /mock5 to
+ /mock8, and 8b8f124 introduced
+ /mock9 to /mock12.
+
+ -
+ The terminal shell file
apps/web/app/terminal.tsx only
+ appeared in commit e7924c8; the later work stayed in
+ shared mock rendering and global styles.
+
+ -
+ The final commit of the day did not add more routes. It refined how
+ one existing mock communicates alert provenance by replacing the
+ Activity Matrix concept with alert lineage, as recorded in the
+
islandflow-4j7 close reason inside
+ .beads/issues.jsonl.
+
+
+
+
+
+ Expected Impact for End-Users
+
+
+
More mock surfaces to review.
+
+ Users reviewing redesign directions now have twelve mock routes
+ instead of four, with route files explicitly added for
+ /mock5 through /mock12.
+
+
+
+
Sharper trading-terminal tone.
+
+ Copy edits in 4204320 moved the mock route language
+ toward the shorter, denser terminal style described in the Beads
+ task for islandflow-w2y.
+
+
+
+
Clearer alert inspection story.
+
+ The final change of the day replaced an abstract matrix view with
+ lineage-oriented evidence and invalidation framing, based on
+ islandflow-4j7.
+
+
+
+
+
+
+ Validation
+
+ -
+ Beads issue
islandflow-2x7 was closed with a note that
+ the mock-route redesigns were verified in the in-app browser and
+ passed the web build plus focused route and terminal tests.
+
+ -
+ Beads issue
islandflow-q7v was closed with web build
+ validation and browser DOM checks for the /mock5 to
+ /mock8 additions.
+
+ -
+ Beads issue
islandflow-5bv was closed with web build
+ validation plus desktop and mobile overflow checks for the
+ /mock9 to /mock12 additions.
+
+ -
+ The standup-summary commit
5e55b70 added documentation
+ only; no additional product validation was recorded in that commit.
+
+
+
+
+
+ Issues, Limitations, and Mitigations
+
+
+
Commit history shows activity, not adoption.
+
+ This summary only states what was committed on June 11. It does
+ not claim which mock route is preferred or whether any redesign is
+ scheduled to ship beyond the files and Beads close reasons recorded
+ that day.
+
+
+
+
Validation details are only as specific as the recorded artifacts.
+
+ Where build or browser checks are mentioned, the source is the
+ close reason added to .beads/issues.jsonl in the same
+ commit stream, not a separately replayed test run for this
+ standup task.
+
+
+
+
+
+
+ Follow-up Work
+
+ -
+ No new follow-up Beads issues were created in the June 11 commit
+ history beyond the work closed that day; the commit stream records
+ completed tasks
islandflow-3vr, 2x7,
+ q7v, w2y, 5bv,
+ 4j7, and ksr.
+
+ -
+ The clearest open context adjacent to this work remains existing
+ in-progress repo items outside the June 11 commit set, not a new
+ follow-up issue created yesterday.
+
+
+
+ Source basis: git log --since="2026-06-11 00:00" --until="2026-06-12 00:00",
+ commit stats from git show --stat, and the paired Beads
+ entries in .beads/issues.jsonl.
+
+
+
+
+