From 2822b2b4855bd2a85939f565b5cdb9ae9522d048 Mon Sep 17 00:00:00 2001 From: dirtydishes Date: Fri, 12 Jun 2026 09:06:09 -0400 Subject: [PATCH] Add June 11 standup git summary --- .beads/issues.jsonl | 1 + ...06-12-0903-standup-summary-2026-06-11.html | 609 ++++++++++++++++++ 2 files changed, 610 insertions(+) create mode 100644 docs/general/2026-06-12-0903-standup-summary-2026-06-11.html diff --git a/.beads/issues.jsonl b/.beads/issues.jsonl index ac5a7f3..63aebba 100644 --- a/.beads/issues.jsonl +++ b/.beads/issues.jsonl @@ -115,6 +115,7 @@ {"_type":"issue","id":"islandflow-zs0","title":"Migrate terminal UI to smart-money profiles","description":"Migrate apps/web terminal rendering to consume SmartMoneyEvent directly: primary profile, probability ladder, reason codes, and suppression/abstention state, while preserving legacy alert/classifier displays during the bridge.","status":"closed","priority":2,"issue_type":"task","owner":"dishes@dpdrm.com","created_at":"2026-05-04T21:35:23Z","created_by":"dirtydishes","updated_at":"2026-05-05T05:39:58Z","closed_at":"2026-05-05T05:39:58Z","close_reason":"Completed terminal smart-money profile migration","dependency_count":0,"dependent_count":0,"comment_count":0} {"_type":"issue","id":"islandflow-igk","title":"Add plan mode","description":"Implement a user-facing plan mode in the application so users can switch into planning before taking action. Scope to be clarified from existing app patterns.","status":"closed","priority":2,"issue_type":"feature","owner":"dishes@dpdrm.com","created_at":"2026-05-04T04:22:37Z","created_by":"dirtydishes","updated_at":"2026-05-04T04:26:18Z","started_at":"2026-05-04T04:22:40Z","closed_at":"2026-05-04T04:26:18Z","close_reason":"Implemented as a global pi extension toggled with Shift+P","dependency_count":0,"dependent_count":0,"comment_count":0} {"_type":"issue","id":"islandflow-biq","title":"Finish raw live options delivery and filter/backpressure observability","description":"The smart-money signal path and Tape filters are in place, but the next firehose pass should finish server-side selective raw live delivery for options subscriptions and add explicit filtered-out/backpressure observability for API/web counters. This was discovered while landing islandflow-e4r.\n","status":"in_progress","priority":2,"issue_type":"task","assignee":"dirtydishes","owner":"dishes@dpdrm.com","created_at":"2026-04-28T20:28:58Z","created_by":"dirtydishes","updated_at":"2026-04-29T03:54:12Z","started_at":"2026-04-29T03:54:12Z","dependencies":[{"issue_id":"islandflow-biq","depends_on_id":"islandflow-e4r","type":"discovered-from","created_at":"2026-04-28T16:28:58Z","created_by":"auto-import","metadata":"{}"}],"dependency_count":0,"dependent_count":0,"comment_count":0} +{"_type":"issue","id":"islandflow-q0t","title":"Publish June 11 standup git summary","description":"## Summary\nCreate the daily git-grounded standup summary for 2026-06-11 activity in docs/general.\n\n## Why this matters\nThe team needs a scannable record of yesterday's repo activity anchored to commits, Beads items, and touched files.\n\n## Scope\nInspect June 11 commits, summarize the work in HTML under docs/general, and close the task once the document is written.","status":"closed","priority":3,"issue_type":"task","assignee":"dirtydishes","owner":"dishes@dpdrm.com","created_at":"2026-06-12T13:03:42Z","created_by":"dirtydishes","updated_at":"2026-06-12T13:05:40Z","started_at":"2026-06-12T13:03:45Z","closed_at":"2026-06-12T13:05:40Z","close_reason":"Created docs/general/2026-06-12-0903-standup-summary-2026-06-11.html with a commit-grounded summary of June 11 activity.","dependency_count":0,"dependent_count":0,"comment_count":0} {"_type":"issue","id":"islandflow-ksr","title":"Publish June 10 standup git summary","description":"Why this issue exists and what needs to be done:\\n\\nCreate the daily standup summary for June 10, 2026 git activity in docs/general, grounded in commits and touched files, then commit and push the documentation update.","status":"closed","priority":3,"issue_type":"task","assignee":"dirtydishes","owner":"dishes@dpdrm.com","created_at":"2026-06-11T13:02:18Z","created_by":"dirtydishes","updated_at":"2026-06-11T13:04:10Z","started_at":"2026-06-11T13:02:35Z","closed_at":"2026-06-11T13:04:10Z","close_reason":"Created docs/general/2026-06-11-0902-standup-summary-2026-06-10.html with a git-grounded summary of June 10 activity.","dependency_count":0,"dependent_count":0,"comment_count":0} {"_type":"issue","id":"islandflow-f09","title":"Publish standup summary for 2026-06-08","description":"Why this issue exists and what needs to be done\\n\\nCreate the daily git-grounded standup summary for repository activity on 2026-06-08, save the HTML artifact in docs/general, and include only statements anchored to commits and touched files.","status":"closed","priority":3,"issue_type":"task","assignee":"dirtydishes","owner":"dishes@dpdrm.com","created_at":"2026-06-09T13:02:31Z","created_by":"dirtydishes","updated_at":"2026-06-09T13:04:19Z","started_at":"2026-06-09T13:02:53Z","closed_at":"2026-06-09T13:04:19Z","close_reason":"Created docs/general/2026-06-09-0902-standup-summary-2026-06-08.html with a git-grounded summary of June 8 activity.","dependency_count":0,"dependent_count":0,"comment_count":0} {"_type":"issue","id":"islandflow-5rt","title":"Summarize June 2 git activity for standup","description":"Create the daily standup summary in docs/general for 2026-06-02 activity, anchored to yesterday's commits and touched files.","status":"closed","priority":3,"issue_type":"task","assignee":"dirtydishes","owner":"dishes@dpdrm.com","created_at":"2026-06-03T16:30:03Z","created_by":"dirtydishes","updated_at":"2026-06-03T16:31:33Z","started_at":"2026-06-03T16:31:26Z","closed_at":"2026-06-03T16:31:33Z","close_reason":"Closed","dependency_count":0,"dependent_count":0,"comment_count":0} diff --git a/docs/general/2026-06-12-0903-standup-summary-2026-06-11.html b/docs/general/2026-06-12-0903-standup-summary-2026-06-11.html new file mode 100644 index 0000000..028b230 --- /dev/null +++ b/docs/general/2026-06-12-0903-standup-summary-2026-06-11.html @@ -0,0 +1,609 @@ + + + + + + Standup Summary for 2026-06-11 + + + +
+
+ Git Standup Summary +

June 11 centered on mock-route expansion and refinement

+

+ June 11 included seven commits. Six of them were frontend-facing mock + route and styling updates in apps/web/app, moving from + initial redesign concepts through twelve mock routes and then replacing + the Activity Matrix with an alert-lineage treatment. One commit + published the prior day’s standup summary in docs/general. +

+
+
+ Date Reviewed + 2026-06-11 +
+
+ Commits + 7 +
+
+ Primary Surface + apps/web mock routes +
+
+ Beads Items Closed + 3vr, 2x7, q7v, w2y, 5bv, 4j7, ksr +
+
+
+ +
+

Summary

+
+
+ Mock coverage widened. +

+ Commits 58ff9bb and 8b8f124 added + route files for /mock5 through /mock12, + while earlier commits reworked the shared mock renderer in + apps/web/app/dashboard-mocks.tsx. +

+
+
+ Shared terminal styling stayed in motion. +

+ Commits 83b0944, e7924c8, + 58ff9bb, 8b8f124, and + dad805b all touched + apps/web/app/globals.css. +

+
+
+ Late-day refinements tightened clarity. +

+ Commit 4204320 tightened terminal copy, and commit + dad805b replaced the abstract Activity Matrix with an + alert-lineage mock recorded under Beads issue + islandflow-4j7. +

+
+
+
+ +
+

Changes Made

+
+
+

04:18 - Ground-up redesign mocks

+
83b0944 - create ground-up frontend redesign mocks
+

+ Reworked apps/web/app/dashboard-mocks.tsx and + apps/web/app/globals.css, and added the supporting + documentation file + docs/turns/2026-06-11-0416-ground-up-redesign-mocks.html. +

+
+ dashboard-mocks.tsx + globals.css + docs/turns/...ground-up-redesign-mocks.html +
+
+ +
+

05:10 - Route concept redesign

+
e7924c8 - redesign mock route concepts
+

+ Continued the mock-route redesign in the same shared renderer and + stylesheet, and also touched + apps/web/app/terminal.tsx. +

+
+ Beads: islandflow-2x7 +
+
+ +
+

09:04 - Prior standup published

+
5e55b70 - Add June 10 standup git summary
+

+ Added + docs/general/2026-06-11-0902-standup-summary-2026-06-10.html + and closed islandflow-ksr. +

+
+ +
+

18:29 - /mock5 through /mock8 added

+
58ff9bb - add no-card mock redesign routes
+

+ Added route files for /mock5, /mock6, + /mock7, and /mock8, plus large updates + to the shared mock renderer, global styles, and a matching turn + document. +

+
+ Beads: islandflow-q7v +
+
+ +
+

19:37 - Copy tightened

+
4204320 - tighten mock route terminal copy
+

+ Refined copy inside apps/web/app/dashboard-mocks.tsx + and updated the existing turn document for the no-card mock work. +

+
+ Beads: islandflow-w2y +
+
+ +
+

19:48 - /mock9 through /mock12 added

+
8b8f124 - add dense dashboard mock routes
+

+ Added route files for /mock9, /mock10, + /mock11, and /mock12, expanded + dashboard-mocks.tsx and globals.css, + and added + docs/turns/2026-06-11-1946-add-four-dashboard-mocks.html. +

+
+ Beads: islandflow-5bv +
+
+ +
+

20:15 - Activity Matrix replaced

+
dad805b - make activity matrix legible
+

+ Updated dashboard-mocks.tsx and + globals.css. The paired Beads close reason says issue + islandflow-4j7 replaced the Activity Matrix with an + alert-lineage mock showing evidence, invalidations, and audit + context. +

+
+
+
+ +
+

Context

+

+ The day’s work stayed concentrated in the mock-dashboard surface of + the web app. The most repeatedly edited files were + apps/web/app/dashboard-mocks.tsx and + apps/web/app/globals.css, which appeared in six of the + seven commits. The only new runtime entrypoints added on June 11 were + the eight route files for /mock5 through + /mock12. +

+
+
+ Route Expansion +

+ Route files added: + mock5/page.tsx through + mock12/page.tsx. +

+
+
+ Documentation Added +

+ New HTML docs landed in both docs/turns and + docs/general. +

+
+
+ Issue Tracking +

+ Each mock-route milestone was paired with a closed Beads task: + 3vr, 2x7, q7v, + w2y, 5bv, and 4j7. +

+
+
+
+ +
+

Important Implementation Details

+
    +
  • + The route additions were incremental rather than a single sweep: + 58ff9bb introduced /mock5 to + /mock8, and 8b8f124 introduced + /mock9 to /mock12. +
  • +
  • + The terminal shell file apps/web/app/terminal.tsx only + appeared in commit e7924c8; the later work stayed in + shared mock rendering and global styles. +
  • +
  • + The final commit of the day did not add more routes. It refined how + one existing mock communicates alert provenance by replacing the + Activity Matrix concept with alert lineage, as recorded in the + islandflow-4j7 close reason inside + .beads/issues.jsonl. +
  • +
+
+ +
+

Expected Impact for End-Users

+
+
+ More mock surfaces to review. +

+ Users reviewing redesign directions now have twelve mock routes + instead of four, with route files explicitly added for + /mock5 through /mock12. +

+
+
+ Sharper trading-terminal tone. +

+ Copy edits in 4204320 moved the mock route language + toward the shorter, denser terminal style described in the Beads + task for islandflow-w2y. +

+
+
+ Clearer alert inspection story. +

+ The final change of the day replaced an abstract matrix view with + lineage-oriented evidence and invalidation framing, based on + islandflow-4j7. +

+
+
+
+ +
+

Validation

+
    +
  • + Beads issue islandflow-2x7 was closed with a note that + the mock-route redesigns were verified in the in-app browser and + passed the web build plus focused route and terminal tests. +
  • +
  • + Beads issue islandflow-q7v was closed with web build + validation and browser DOM checks for the /mock5 to + /mock8 additions. +
  • +
  • + Beads issue islandflow-5bv was closed with web build + validation plus desktop and mobile overflow checks for the + /mock9 to /mock12 additions. +
  • +
  • + The standup-summary commit 5e55b70 added documentation + only; no additional product validation was recorded in that commit. +
  • +
+
+ +
+

Issues, Limitations, and Mitigations

+
+
+ Commit history shows activity, not adoption. +

+ This summary only states what was committed on June 11. It does + not claim which mock route is preferred or whether any redesign is + scheduled to ship beyond the files and Beads close reasons recorded + that day. +

+
+
+ Validation details are only as specific as the recorded artifacts. +

+ Where build or browser checks are mentioned, the source is the + close reason added to .beads/issues.jsonl in the same + commit stream, not a separately replayed test run for this + standup task. +

+
+
+
+ +
+

Follow-up Work

+
    +
  • + No new follow-up Beads issues were created in the June 11 commit + history beyond the work closed that day; the commit stream records + completed tasks islandflow-3vr, 2x7, + q7v, w2y, 5bv, + 4j7, and ksr. +
  • +
  • + The clearest open context adjacent to this work remains existing + in-progress repo items outside the June 11 commit set, not a new + follow-up issue created yesterday. +
  • +
+

+ Source basis: git log --since="2026-06-11 00:00" --until="2026-06-12 00:00", + commit stats from git show --stat, and the paired Beads + entries in .beads/issues.jsonl. +

+
+
+ +