tighten implementation planning traceability
All checks were successful
CI / Validate (pull_request) Successful in 1m15s

This commit is contained in:
dirtydishes 2026-06-16 14:18:23 -04:00
parent 8ecf71aad2
commit b1b18d4f17
17 changed files with 48 additions and 24 deletions

View file

@ -12,6 +12,7 @@ The current system has useful infrastructure but overconfident domain names. Bef
- Architecture plan: [`docs/plans/smart-flow-architecture-review.md`](../../plans/smart-flow-architecture-review.md)
- Research report: [`docs/research-docs/smart-flow-market-mechanics.md`](../../research-docs/smart-flow-market-mechanics.md)
- Research architecture review copy: [`docs/research-docs/smart-flow-architecture-review.md`](../../research-docs/smart-flow-architecture-review.md)
These documents are rationale, not added scope. This phase implements only vocabulary, contracts, versioning, and compatibility notes.
@ -27,7 +28,7 @@ These documents are rationale, not added scope. This phase implements only vocab
## Dependencies on earlier phases
- `islandflow-259.1` - Synthetic deterministic spine, so contract work can align with canonical raw event and provenance assumptions.
None. This phase can safely run in parallel with `islandflow-259.1`; align on the existing canonical raw market event contracts and provenance assumptions, but do not wait for synthetic package implementation.
## Likely files/modules touched