813 B
813 B
Native, Fast, Iterative Deployment Plan (Docker Optional)
Date: 2026-05-18
Plan Steps (15)
- ☐ Stop the bleeding immediately (current deploy loop).
- ☐ Get hard timing data per deploy phase.
- ☐ Live server state audit (when plan mode is off).
- ☐ Resolve duplicate compose stack first (islandflow-2db).
- ☐ Fix NPM proxy route regression (islandflow-sz8).
- ☐ Define target iterative deployment model.
- ☐ Prepare native runtime prerequisites on VPS.
- ☐ Checked-in native ops assets (islandflow-38p).
- ☐ Switch proxy topology for native mode carefully.
- ☐ Deploy strategy guardrails.
- ☐ Validation matrix.
- ☐ Staged cutover plan.
- ☐ Decision: final default runtime.
- ☐ Decision: optimization priority.
- ☐ Decision: immediate live audit kickoff.